Works: | 71 works in 10 publications in 10 languages |
---|
Titles
建築奇觀 = = Man made marvels:Taiwan's Hsuehshan tunnel / . [12], . 台灣雪山隧道
by:
(Projected and video material)
烏山嶺第2隧道初步規劃-工程規劃(含工程測量)專題 = = Preliminary plan of Wu-Shan-Ling second tunnel report on engineering plan and survey /
by:
(Language materials, printed)
烏山嶺第2隧道初步規劃 = = Preliminary plan of Wu-Shan-Ling second tunnel report on geological survey and evaluation : 工程地質綜合評估專題 /
by:
(Language materials, printed)
內湖線潛盾隧道穿越松山機場沉陷控制 = = Settlement minimization of shield tunnel construction under Songshan airport /
by:
(Language materials, printed)
機場線雙圓潛盾機與環片製作實務 = = Manufacture of DOT shield machine and concrete lining : Taiwan Taoyuan International Airport access MRT system /
by:
(Language materials, printed)
雙圓潛盾隧道施工實務 = = The practical application of Double-O-Tube(DOT) shield tunneling /
by:
(Language materials, printed)
捷運潛盾隧道混凝土環片生產實務 = = Practice of concrete lining for the Taipei MRT shield tunneling /
by:
(Language materials, printed)
烏山嶺第2隧道環境影響評估 = = Environmental impact assessment of Wu-Shan-Ling second tunnel /
by:
(Language materials, printed)
隧道工程施工技術解說圖冊 = = An illustrative overview on construction technique in tunnelling: connecting here and the direction toward protest : 連結希望前進的方向 /
by:
(Language materials, printed)
機場線雙圓型潛盾隧道規劃設計 = = Planning and design of the DOT tunnel of the Taiwan Taoyuan Airport MRT Line /
by:
(Language materials, printed)
冷凍工法 = = Freezing method : construction and management practice of freezing method applied on a Xinzhuang Line shield tunnel work shaft / . (2). ; (二), . 新莊線潛盾工作井冷凍工法施工與管理實務
by:
(Language materials, printed)
新莊線潛盾隧道穿越台鐵高鐵結構工程 = = Xinzhuang Line's shield tunnels passing beneath existing construction of Taiwan Railways and Taiwan High Speed Rail /
by:
(Language materials, printed)
冷凍工法 = = Freezing method : case study of freezing method applied on a tunnel joint accident recovery / . (4). ; (四), . 隧道接頭意外事故復原案例
by:
(Language materials, printed)
捷運松山線潛盾隧道鄰近構造設計與施工 = = Design and construction of shield tunnels for the MRT songshan line in close proximity to existing structures /
by:
(Language materials, printed)
捷運工程多條隧道鄰近堆疊施工實務 = = Practice of adjacent multi-tiered Taipei MRT tunnel construction /
by:
(Language materials, printed)
烏山嶺第2隧道可行性規劃 = = Feasibility planning of Wu-shan-ling second tunnel report on engineering plan : 工程規劃專題 /
by:
(Language materials, printed)
烏山嶺第2隧道可行性規劃 = = Feasibility planning of Wu-shan-ling second tunnel report on supplementary geological survey : 工程地質補充調查及試驗專題 /
by:
(Language materials, printed)
烏山嶺第2隧道可行性規劃 = = Feasibility planning of Wu-shan-ling second tunnel report on engineering survey : 工程補充測量專題 /
by:
(Language materials, printed)
烏山嶺第2隧道可行性規劃總報告 = = Summary report of feasibility planning of Wu-shan-ling second tunnel /
by: