語系:
繁體中文
English
說明(常見問題)
回圖書館首頁
手機版館藏查詢
登入
回首頁
切換:
標籤
|
MARC模式
|
ISBD
Modeling & Small Signal Analysis of ...
~
Hepburn, K'Adesh.
FindBook
Google Book
Amazon
博客來
Modeling & Small Signal Analysis of Grid Forming Inverter.
紀錄類型:
書目-電子資源 : Monograph/item
正題名/作者:
Modeling & Small Signal Analysis of Grid Forming Inverter./
作者:
Hepburn, K'Adesh.
出版者:
Ann Arbor : ProQuest Dissertations & Theses, : 2023,
面頁冊數:
94 p.
附註:
Source: Masters Abstracts International, Volume: 85-03.
Contained By:
Masters Abstracts International85-03.
標題:
Electrical engineering. -
電子資源:
https://pqdd.sinica.edu.tw/twdaoapp/servlet/advanced?query=30571480
ISBN:
9798380171700
Modeling & Small Signal Analysis of Grid Forming Inverter.
Hepburn, K'Adesh.
Modeling & Small Signal Analysis of Grid Forming Inverter.
- Ann Arbor : ProQuest Dissertations & Theses, 2023 - 94 p.
Source: Masters Abstracts International, Volume: 85-03.
Thesis (M.S.E.E.)--University of Arkansas, 2023.
This item must not be sold to any third party vendors.
There is a rising number of inverter-based resources (IBRs) being integrated with distribution systems are becoming a more common occurrence. With integration of IBRs inverters, power utilities are experiencing an increase of number of operations with regards to voltage and frequency support. To maintain grid stability and reliability, IBRs need to provide some of the services currently (or formerly) provided by synchronous generators. Interconnection standards, like the IEEE 1547. 2018 has include requirements for IBRs to have the capability to provide some of these services-such as frequency and voltage support-and the procurement and deployment of the services can be implemented either as mandatory interconnection requirements or as market products. All the IBRs deployed today are grid-following (GFL), and read the voltage and frequency of the grid and inject current to provide the appropriate amount of active and reactive power. The fundamental GFL IBR design assumption is that there are still enough synchronous generators on the grid to provide a relatively strong and stable voltage and frequency signal, which GFL IBRs can "follow." But since levels of GFL are increasing, there will be a limit to how far GFL controls can be pushed, and, at some point, new advanced inverter controls (termed grid forming (GFM)) will be needed to maintain system stability. GFM IBRs will also be needed to establish voltage and frequency during operating conditions when there are zero synchronous machines (100 percent IBR penetration). Power systems around the world are at the point of now needing to make this technological leap; however, system operators and planners, equipment owners, and manufacturers today are facing a circular problem regarding the deployment of advanced IBR controls. Which comes first, the requirement for a capability or the capability itself? How do grid operators know what performance or capability is possible from new equipment (and therefore what they could require)? How can they evaluate costs and benefits of having such equipment on the grid? What drives manufacturers to invest in modern technology without its being mandated for interconnection to the grid or otherwise incentivized by the market?The objective of this thesis is to provide a better understanding of ride through fault capabilities of Grid Forming Inverter (GFM) tied into the generation side of the power grid when using control functions. Furthermore, to investigate the robustness of implementing time delay with a PLL system within the control settings for grid forming inverters. To this end, to identify the contributing factors that affects the stability of the time delay to better design and future models of GFMs. As discussed, the microgrid is a potential solution for future distributed generation systems. However, controlling a microgrid is still a complex issue and many proposed solutions, are only based on locally measured signals without any communications; thus, it is difficult to achieve global optimization. Future works on this topic will analyse the role of restoration practices, communication control techniques to better approximate the delay. The specific areas below will be discussed in this thesis.
ISBN: 9798380171700Subjects--Topical Terms:
649834
Electrical engineering.
Subjects--Index Terms:
Microgrid Inverter
Modeling & Small Signal Analysis of Grid Forming Inverter.
LDR
:04569nmm a2200409 4500
001
2395732
005
20240517105004.5
006
m o d
007
cr#unu||||||||
008
251215s2023 ||||||||||||||||| ||eng d
020
$a
9798380171700
035
$a
(MiAaPQ)AAI30571480
035
$a
AAI30571480
040
$a
MiAaPQ
$c
MiAaPQ
100
1
$a
Hepburn, K'Adesh.
$3
3765240
245
1 0
$a
Modeling & Small Signal Analysis of Grid Forming Inverter.
260
1
$a
Ann Arbor :
$b
ProQuest Dissertations & Theses,
$c
2023
300
$a
94 p.
500
$a
Source: Masters Abstracts International, Volume: 85-03.
500
$a
Advisor: McCann, Roy.
502
$a
Thesis (M.S.E.E.)--University of Arkansas, 2023.
506
$a
This item must not be sold to any third party vendors.
506
$a
This item must not be sold to any third party vendors.
506
$a
This item is not available from ProQuest Dissertations & Theses.
520
$a
There is a rising number of inverter-based resources (IBRs) being integrated with distribution systems are becoming a more common occurrence. With integration of IBRs inverters, power utilities are experiencing an increase of number of operations with regards to voltage and frequency support. To maintain grid stability and reliability, IBRs need to provide some of the services currently (or formerly) provided by synchronous generators. Interconnection standards, like the IEEE 1547. 2018 has include requirements for IBRs to have the capability to provide some of these services-such as frequency and voltage support-and the procurement and deployment of the services can be implemented either as mandatory interconnection requirements or as market products. All the IBRs deployed today are grid-following (GFL), and read the voltage and frequency of the grid and inject current to provide the appropriate amount of active and reactive power. The fundamental GFL IBR design assumption is that there are still enough synchronous generators on the grid to provide a relatively strong and stable voltage and frequency signal, which GFL IBRs can "follow." But since levels of GFL are increasing, there will be a limit to how far GFL controls can be pushed, and, at some point, new advanced inverter controls (termed grid forming (GFM)) will be needed to maintain system stability. GFM IBRs will also be needed to establish voltage and frequency during operating conditions when there are zero synchronous machines (100 percent IBR penetration). Power systems around the world are at the point of now needing to make this technological leap; however, system operators and planners, equipment owners, and manufacturers today are facing a circular problem regarding the deployment of advanced IBR controls. Which comes first, the requirement for a capability or the capability itself? How do grid operators know what performance or capability is possible from new equipment (and therefore what they could require)? How can they evaluate costs and benefits of having such equipment on the grid? What drives manufacturers to invest in modern technology without its being mandated for interconnection to the grid or otherwise incentivized by the market?The objective of this thesis is to provide a better understanding of ride through fault capabilities of Grid Forming Inverter (GFM) tied into the generation side of the power grid when using control functions. Furthermore, to investigate the robustness of implementing time delay with a PLL system within the control settings for grid forming inverters. To this end, to identify the contributing factors that affects the stability of the time delay to better design and future models of GFMs. As discussed, the microgrid is a potential solution for future distributed generation systems. However, controlling a microgrid is still a complex issue and many proposed solutions, are only based on locally measured signals without any communications; thus, it is difficult to achieve global optimization. Future works on this topic will analyse the role of restoration practices, communication control techniques to better approximate the delay. The specific areas below will be discussed in this thesis.
590
$a
School code: 0011.
650
4
$a
Electrical engineering.
$3
649834
650
4
$a
Technical communication.
$3
3172863
650
4
$a
Systems science.
$3
3168411
653
$a
Microgrid Inverter
653
$a
Small signal analysis
653
$a
Grid forming inverter
653
$a
Interconnection requirements
690
$a
0544
690
$a
0643
690
$a
0790
710
2
$a
University of Arkansas.
$b
Electrical Engineering.
$3
2103922
773
0
$t
Masters Abstracts International
$g
85-03.
790
$a
0011
791
$a
M.S.E.E.
792
$a
2023
793
$a
English
856
4 0
$u
https://pqdd.sinica.edu.tw/twdaoapp/servlet/advanced?query=30571480
筆 0 讀者評論
館藏地:
全部
電子資源
出版年:
卷號:
館藏
1 筆 • 頁數 1 •
1
條碼號
典藏地名稱
館藏流通類別
資料類型
索書號
使用類型
借閱狀態
預約狀態
備註欄
附件
W9504052
電子資源
11.線上閱覽_V
電子書
EB
一般使用(Normal)
在架
0
1 筆 • 頁數 1 •
1
多媒體
評論
新增評論
分享你的心得
Export
取書館
處理中
...
變更密碼
登入