An Analysis of Estimated Costs Versus Actual Costs in Usace Section 14 Emergency Streambank Protection Projects.
紀錄類型:
書目-電子資源 : Monograph/item
正題名/作者:
An Analysis of Estimated Costs Versus Actual Costs in Usace Section 14 Emergency Streambank Protection Projects./
作者:
Waugaman, Hunter.
出版者:
Ann Arbor : ProQuest Dissertations & Theses, : 2021,
面頁冊數:
57 p.
附註:
Source: Masters Abstracts International, Volume: 82-11.
Contained By:
Masters Abstracts International82-11.
標題:
Engineering. -
電子資源:
https://pqdd.sinica.edu.tw/twdaoapp/servlet/advanced?query=28413294
ISBN:
9798728268994
An Analysis of Estimated Costs Versus Actual Costs in Usace Section 14 Emergency Streambank Protection Projects.
Waugaman, Hunter.
An Analysis of Estimated Costs Versus Actual Costs in Usace Section 14 Emergency Streambank Protection Projects.
- Ann Arbor : ProQuest Dissertations & Theses, 2021 - 57 p.
Source: Masters Abstracts International, Volume: 82-11.
Thesis (M.S.)--Marshall University, 2021.
This item must not be sold to any third party vendors.
The U.S. Army Corps of Engineers (USACE) Civil Works projects are designed to provide national management of water resources. These works use emergency streambank protection to protect public facilities, like bridges and highways. The projects under this authority have limited funding, therefore, many design and field studies are omitted, which increases project uncertainties resulting in cost overruns and contract modifications. This study analyzes previously constructed projects by comparing the independent government estimate with the contractor's actual costs and identifying the variables causing these differences via statistical analysis. The variables identified are categorized into those elements that affect the accuracy of the government estimate. From the findings of this categorization, a linear regression model was used in SPSS to identify which variables were predictors for causing cost overruns. From the analysis, it was found that 65.8% of the variance in the fourteen Section 14 projects selected can be predicted from the variable Rip Rap Placement and Material. Furthermore, 78.4% of the variance in these same projects can be predicted from the variables Rip Rap Placement and Material and Filter Fabric. These results serve as a basis for future Section 14 projects to identify which bid items affect the total cost the most and ensure to place adequate effort in estimating those items appropriately.
ISBN: 9798728268994Subjects--Topical Terms:
586835
Engineering.
Subjects--Index Terms:
Cost Overrun
An Analysis of Estimated Costs Versus Actual Costs in Usace Section 14 Emergency Streambank Protection Projects.
LDR
:02648nmm a2200397 4500
001
2284613
005
20211123073359.5
008
220723s2021 ||||||||||||||||| ||eng d
020
$a
9798728268994
035
$a
(MiAaPQ)AAI28413294
035
$a
AAI28413294
040
$a
MiAaPQ
$c
MiAaPQ
100
1
$a
Waugaman, Hunter.
$3
3563793
245
1 3
$a
An Analysis of Estimated Costs Versus Actual Costs in Usace Section 14 Emergency Streambank Protection Projects.
260
1
$a
Ann Arbor :
$b
ProQuest Dissertations & Theses,
$c
2021
300
$a
57 p.
500
$a
Source: Masters Abstracts International, Volume: 82-11.
500
$a
Advisor: Bryce, James;Al Zarrad, Mohammad.
502
$a
Thesis (M.S.)--Marshall University, 2021.
506
$a
This item must not be sold to any third party vendors.
520
$a
The U.S. Army Corps of Engineers (USACE) Civil Works projects are designed to provide national management of water resources. These works use emergency streambank protection to protect public facilities, like bridges and highways. The projects under this authority have limited funding, therefore, many design and field studies are omitted, which increases project uncertainties resulting in cost overruns and contract modifications. This study analyzes previously constructed projects by comparing the independent government estimate with the contractor's actual costs and identifying the variables causing these differences via statistical analysis. The variables identified are categorized into those elements that affect the accuracy of the government estimate. From the findings of this categorization, a linear regression model was used in SPSS to identify which variables were predictors for causing cost overruns. From the analysis, it was found that 65.8% of the variance in the fourteen Section 14 projects selected can be predicted from the variable Rip Rap Placement and Material. Furthermore, 78.4% of the variance in these same projects can be predicted from the variables Rip Rap Placement and Material and Filter Fabric. These results serve as a basis for future Section 14 projects to identify which bid items affect the total cost the most and ensure to place adequate effort in estimating those items appropriately.
590
$a
School code: 0817.
650
4
$a
Engineering.
$3
586835
650
4
$a
Civil engineering.
$3
860360
650
4
$a
Water resources management.
$3
794747
653
$a
Cost Overrun
653
$a
Government
653
$a
Regression
653
$a
Section 14
653
$a
SPSS
653
$a
USACE
653
$a
Army Corps of Engineers
690
$a
0537
690
$a
0543
690
$a
0595
710
2
$a
Marshall University.
$b
Engineering.
$3
3563794
773
0
$t
Masters Abstracts International
$g
82-11.
790
$a
0817
791
$a
M.S.
792
$a
2021
793
$a
English
856
4 0
$u
https://pqdd.sinica.edu.tw/twdaoapp/servlet/advanced?query=28413294
筆 0 讀者評論
館藏地:
全部
電子資源
出版年:
卷號:
館藏
1 筆 • 頁數 1 •
1
條碼號
典藏地名稱
館藏流通類別
資料類型
索書號
使用類型
借閱狀態
預約狀態
備註欄
附件
W9436346
電子資源
11.線上閱覽_V
電子書
EB
一般使用(Normal)
在架
0
1 筆 • 頁數 1 •
1
多媒體
評論
新增評論
分享你的心得
Export
取書館
處理中
...
變更密碼
登入