語系:
繁體中文
English
說明(常見問題)
回圖書館首頁
手機版館藏查詢
登入
回首頁
切換:
標籤
|
MARC模式
|
ISBD
Higher Education Deferred Maintenanc...
~
Fisher, Robert D.
FindBook
Google Book
Amazon
博客來
Higher Education Deferred Maintenance: Perceptions of Campus Facilities Leaders.
紀錄類型:
書目-電子資源 : Monograph/item
正題名/作者:
Higher Education Deferred Maintenance: Perceptions of Campus Facilities Leaders./
作者:
Fisher, Robert D.
出版者:
Ann Arbor : ProQuest Dissertations & Theses, : 2018,
面頁冊數:
219 p.
附註:
Source: Dissertation Abstracts International, Volume: 80-05(E), Section: A.
Contained By:
Dissertation Abstracts International80-05A(E).
標題:
Educational leadership. -
電子資源:
http://pqdd.sinica.edu.tw/twdaoapp/servlet/advanced?query=10229879
ISBN:
9780438796102
Higher Education Deferred Maintenance: Perceptions of Campus Facilities Leaders.
Fisher, Robert D.
Higher Education Deferred Maintenance: Perceptions of Campus Facilities Leaders.
- Ann Arbor : ProQuest Dissertations & Theses, 2018 - 219 p.
Source: Dissertation Abstracts International, Volume: 80-05(E), Section: A.
Thesis (Ed.D.)--Johnson & Wales University, 2018.
Deferred maintenance is a major contributor to the huge infrastructure problems plaguing the nation (ASCE, 2017). The bill for deferred maintenance at Massachusetts public higher education institutions is estimated at $5.5 billion (Krantz, 2017). Deferred maintenance causes premature equipment failure, health and safety issues, increased energy costs, interruptions in student learning, and reduced student recruitment and retention (Smith, 2017). To understand problems associated with deferred maintenance at state universities, knowing the views of those responsible for maintenance programs is essential.
ISBN: 9780438796102Subjects--Topical Terms:
529436
Educational leadership.
Higher Education Deferred Maintenance: Perceptions of Campus Facilities Leaders.
LDR
:03640nmm a2200337 4500
001
2204674
005
20190709113043.5
008
201008s2018 ||||||||||||||||| ||eng d
020
$a
9780438796102
035
$a
(MiAaPQ)AAI10229879
035
$a
(MiAaPQ)jwu:10171
035
$a
AAI10229879
040
$a
MiAaPQ
$c
MiAaPQ
100
1
$a
Fisher, Robert D.
$3
3431544
245
1 0
$a
Higher Education Deferred Maintenance: Perceptions of Campus Facilities Leaders.
260
1
$a
Ann Arbor :
$b
ProQuest Dissertations & Theses,
$c
2018
300
$a
219 p.
500
$a
Source: Dissertation Abstracts International, Volume: 80-05(E), Section: A.
500
$a
Adviser: Cynthia V. L. Ward.
502
$a
Thesis (Ed.D.)--Johnson & Wales University, 2018.
520
$a
Deferred maintenance is a major contributor to the huge infrastructure problems plaguing the nation (ASCE, 2017). The bill for deferred maintenance at Massachusetts public higher education institutions is estimated at $5.5 billion (Krantz, 2017). Deferred maintenance causes premature equipment failure, health and safety issues, increased energy costs, interruptions in student learning, and reduced student recruitment and retention (Smith, 2017). To understand problems associated with deferred maintenance at state universities, knowing the views of those responsible for maintenance programs is essential.
520
$a
This study explored how facilities leaders at state universities perceived deferred maintenance issues by addressing five research questions. 1. To what degree are the magnitude and consequences of deferred maintenance realized? 2. What factors contribute to deferred maintenance? 3. What factors hinder implementation of reduction efforts? 4. What are successful strategies for reducing deferred maintenance? 5. How can facilities leaders affect institutional change to reduce deferred maintenance?
520
$a
The study used Q methodology, which combines both quantitative and qualitative techniques (Ellingsen, Storksen, & Stephens, 2010), to analyze relative viewpoints on deferred maintenance of purposefully selected state university facilities leaders (N = 19). Data collection was accomplished through participants ranking 49 statements from agree with to disagree with by sorting and positioning the statements into a normal curve distribution grid (Brown, 1993). PQMethod Release 2.35 freeware (Schmolck & Atkinson, 2014) was employed for calculating correlations, factoring, needed rotations, and final analysis.
520
$a
Data analysis revealed three factor groups: Realist Leaders, Optimistic Leaders, and Front Line Leaders. Each group had some unique viewpoints while sharing consensus on several viewpoints. Overall, the results showed little realization of the magnitude and the consequences of deferred maintenance issues; sometimes this was by design. Building age, construction quality, usage, and building acquisitions were major factors contributing to deferred maintenance. Lack of funds, unexpected projects, and procurement procedures were viewed as hindrances. Identified successful strategies included preventive maintenance, shared use of standardized and non-proprietary equipment, and reliance on study results. Participation of facilities leaders at senior level meetings was viewed as key to affecting change. Results of the study should assist educational leaders in understanding and reducing deferred maintenance.
590
$a
School code: 1346.
650
4
$a
Educational leadership.
$3
529436
650
4
$a
Higher education administration.
$3
2122863
690
$a
0449
690
$a
0446
710
2
$a
Johnson & Wales University.
$b
Education.
$3
1022587
773
0
$t
Dissertation Abstracts International
$g
80-05A(E).
790
$a
1346
791
$a
Ed.D.
792
$a
2018
793
$a
English
856
4 0
$u
http://pqdd.sinica.edu.tw/twdaoapp/servlet/advanced?query=10229879
筆 0 讀者評論
館藏地:
全部
電子資源
出版年:
卷號:
館藏
1 筆 • 頁數 1 •
1
條碼號
典藏地名稱
館藏流通類別
資料類型
索書號
使用類型
借閱狀態
預約狀態
備註欄
附件
W9381223
電子資源
11.線上閱覽_V
電子書
EB
一般使用(Normal)
在架
0
1 筆 • 頁數 1 •
1
多媒體
評論
新增評論
分享你的心得
Export
取書館
處理中
...
變更密碼
登入