Language:
English
繁體中文
Help
回圖書館首頁
手機版館藏查詢
Login
Back
Switch To:
Labeled
|
MARC Mode
|
ISBD
Estimation of optimal productivity i...
~
Kisi, Krishna Prasad.
Linked to FindBook
Google Book
Amazon
博客來
Estimation of optimal productivity in labor-intensive construction operations.
Record Type:
Electronic resources : Monograph/item
Title/Author:
Estimation of optimal productivity in labor-intensive construction operations./
Author:
Kisi, Krishna Prasad.
Description:
264 p.
Notes:
Source: Dissertation Abstracts International, Volume: 76-11(E), Section: B.
Contained By:
Dissertation Abstracts International76-11B(E).
Subject:
Engineering. -
Online resource:
http://pqdd.sinica.edu.tw/twdaoapp/servlet/advanced?query=3712536
ISBN:
9781321894349
Estimation of optimal productivity in labor-intensive construction operations.
Kisi, Krishna Prasad.
Estimation of optimal productivity in labor-intensive construction operations.
- 264 p.
Source: Dissertation Abstracts International, Volume: 76-11(E), Section: B.
Thesis (Ph.D.)--The University of Nebraska - Lincoln, 2015.
In an attempt to evaluate the efficiency of labor-intensive construction operations, project managers typically compare actual with historical productivity for equivalent operations. However, this approach toward examining productivity only provides a relative benchmark for efficiency and may lead to the characterization of operations as objectively efficient when in reality such operations might simply be comparably efficient. Just because actual productivity equals average historical productivity does not necessarily mean that an operation is efficient; the case may be that the operation's efficiency is only in line with historical averages, which may be well below optimal productivity.
ISBN: 9781321894349Subjects--Topical Terms:
586835
Engineering.
Estimation of optimal productivity in labor-intensive construction operations.
LDR
:03460nmm a2200325 4500
001
2070414
005
20160606115813.5
008
170521s2015 eng d
020
$a
9781321894349
035
$a
(MiAaPQ)AAI3712536
035
$a
AAI3712536
040
$a
MiAaPQ
$c
MiAaPQ
100
1
$a
Kisi, Krishna Prasad.
$3
1671835
245
1 0
$a
Estimation of optimal productivity in labor-intensive construction operations.
300
$a
264 p.
500
$a
Source: Dissertation Abstracts International, Volume: 76-11(E), Section: B.
500
$a
Advisers: Terence Foster; Eddy M. Rojas.
502
$a
Thesis (Ph.D.)--The University of Nebraska - Lincoln, 2015.
520
$a
In an attempt to evaluate the efficiency of labor-intensive construction operations, project managers typically compare actual with historical productivity for equivalent operations. However, this approach toward examining productivity only provides a relative benchmark for efficiency and may lead to the characterization of operations as objectively efficient when in reality such operations might simply be comparably efficient. Just because actual productivity equals average historical productivity does not necessarily mean that an operation is efficient; the case may be that the operation's efficiency is only in line with historical averages, which may be well below optimal productivity.
520
$a
Optimal productivity is the highest sustainable productivity achievable under good management and typical field conditions. Optimal productivity is useful in the determination of the absolute efficiency of construction operations because an accurate estimate of optimal labor productivity allows for the comparison of actual vs. optimal (unbiased) rather than actual vs. historical (biased) productivity.
520
$a
This research contributes to the body of knowledge by introducing a two-prong strategy for estimating optimal labor productivity in labor-intensive construction operations and applying it in an activity with a single worker and sequential tasks as well as in an activity with multiple workers and sequential and parallel tasks. The first prong, or a top-down approach, estimates the upper limit of optimal productivity by introducing system inefficiencies into the productivity frontier -- productivity achieved under perfect conditions. A qualitative factor model is used to achieve this objective. The second prong, or a bottom-up approach, estimates the lower limit of optimal productivity by taking away operational inefficiency from actual productivity -- productivity recorded in the field. A discrete event simulation model is used to estimate this value. An average of the upper and lower limits is taken as the best estimate of optimal productivity.
520
$a
In conjunction with a relevant literature review and a discussion of the two-prong approach's methodology, this research ultimately analyzes data from a pilot study with a single worker and sequential actions and an advanced study containing multiple workers and sequential and parallel tasks and actions, and evaluates the feasibility of this two-prong strategy for estimating optimal productivity in construction operations.
590
$a
School code: 0138.
650
4
$a
Engineering.
$3
586835
650
4
$a
Civil engineering.
$3
860360
650
4
$a
Management.
$3
516664
690
$a
0537
690
$a
0543
690
$a
0454
710
2 0
$a
The University of Nebraska - Lincoln.
$b
Engineering.
$3
1036176
773
0
$t
Dissertation Abstracts International
$g
76-11B(E).
790
$a
0138
791
$a
Ph.D.
792
$a
2015
793
$a
English
856
4 0
$u
http://pqdd.sinica.edu.tw/twdaoapp/servlet/advanced?query=3712536
based on 0 review(s)
Location:
ALL
電子資源
Year:
Volume Number:
Items
1 records • Pages 1 •
1
Inventory Number
Location Name
Item Class
Material type
Call number
Usage Class
Loan Status
No. of reservations
Opac note
Attachments
W9303282
電子資源
11.線上閱覽_V
電子書
EB
一般使用(Normal)
On shelf
0
1 records • Pages 1 •
1
Multimedia
Reviews
Add a review
and share your thoughts with other readers
Export
pickup library
Processing
...
Change password
Login