臺北捷運潛盾隧道地中鑿除擋土壁施工實務 : = 以松山線CG590A標穿...
余念梓

Linked to FindBook      Google Book      Amazon      博客來     
  • 臺北捷運潛盾隧道地中鑿除擋土壁施工實務 : = 以松山線CG590A標穿越臺/高鐵下方為例 = The practical application of retaining wall removal in Taipei MRT shield tunnel construction : taking construction of Songshan line contract CG590A passing beneath the Taiwan railways and Taiwan high speed rail tunnels as an example /
  • Record Type: Language materials, printed : Monograph/item
    Title/Author: 臺北捷運潛盾隧道地中鑿除擋土壁施工實務 :/ 余念梓等編撰 ; 刑華濤總編輯
    Reminder of title: 以松山線CG590A標穿越臺/高鐵下方為例 = The practical application of retaining wall removal in Taipei MRT shield tunnel construction : taking construction of Songshan line contract CG590A passing beneath the Taiwan railways and Taiwan high speed rail tunnels as an example /
    remainder title: The practical application of retaining wall removal in Taipei MRT shield tunnel construction : taking construction of Songshan line contract CG590A passing beneath the Taiwan railways and Taiwan high speed rail tunnels as an example
    Author: 余念梓
    other author: 刑華濤
    Published: 臺北市 :臺北市政府捷運工程局, : 2016,
    Description: 307面 :彩圖 ;30公分
    Subject: 捷運車站 -
    ISBN: 9789860480238
Location:  Year:  Volume Number: 
Items
  • 1 records • Pages 1 •
 
GE0167136 四樓中文書區000-599(4F Eastern Language Books) 01.外借(書)_YB 一般圖書 442.96 5312 v.58 一般使用(Normal) On shelf 0
  • 1 records • Pages 1 •
Reviews
Export
pickup library
 
 
Change password
Login