Language:
English
繁體中文
Help
回圖書館首頁
手機版館藏查詢
Login
Back
Switch To:
Labeled
|
MARC Mode
|
ISBD
Quantifying the impact of schedule c...
~
Chang, Chul-Ki.
Linked to FindBook
Google Book
Amazon
博客來
Quantifying the impact of schedule compression on construction labor productivity.
Record Type:
Electronic resources : Monograph/item
Title/Author:
Quantifying the impact of schedule compression on construction labor productivity./
Author:
Chang, Chul-Ki.
Description:
177 p.
Notes:
Source: Dissertation Abstracts International, Volume: 65-08, Section: B, page: 4164.
Contained By:
Dissertation Abstracts International65-08B.
Subject:
Engineering, Civil. -
Online resource:
http://pqdd.sinica.edu.tw/twdaoapp/servlet/advanced?query=3143154
ISBN:
0496011227
Quantifying the impact of schedule compression on construction labor productivity.
Chang, Chul-Ki.
Quantifying the impact of schedule compression on construction labor productivity.
- 177 p.
Source: Dissertation Abstracts International, Volume: 65-08, Section: B, page: 4164.
Thesis (Ph.D.)--The University of Wisconsin - Madison, 2004.
The reduction of time available to complete a project is commonly known throughout the construction industry as schedule compression. Schedule compression is a problem because it negatively impacts labor productivity in various ways, and it beco
ISBN: 0496011227Subjects--Topical Terms:
783781
Engineering, Civil.
Quantifying the impact of schedule compression on construction labor productivity.
LDR
:01675nmm 2200301 4500
001
1845828
005
20051024140519.5
008
130614s2004 eng d
020
$a
0496011227
035
$a
(UnM)AAI3143154
035
$a
AAI3143154
040
$a
UnM
$c
UnM
100
1
$a
Chang, Chul-Ki.
$3
1933973
245
1 0
$a
Quantifying the impact of schedule compression on construction labor productivity.
300
$a
177 p.
500
$a
Source: Dissertation Abstracts International, Volume: 65-08, Section: B, page: 4164.
500
$a
Supervisor: Awad S. Hanna.
502
$a
Thesis (Ph.D.)--The University of Wisconsin - Madison, 2004.
520
$a
The reduction of time available to complete a project is commonly known throughout the construction industry as schedule compression. Schedule compression is a problem because it negatively impacts labor productivity in various ways, and it beco
520
$a
The objectives of this research were to investigate and quantify the impact of the three most common schedule compression methods: overtime, overmanning, and shift work on construction labor productivity, and to develop a model that quantifies t
520
$a
The first objective was achieved by developing quantification models for each respective method. The second objective was achieved by introducing a quantitative definition of schedule compression that compares actual project duration to its corr
590
$a
School code: 0262.
650
4
$a
Engineering, Civil.
$3
783781
650
4
$a
Sociology, Industrial and Labor Relations.
$3
1017858
690
$a
0543
690
$a
0629
710
2 0
$a
The University of Wisconsin - Madison.
$3
626640
773
0
$t
Dissertation Abstracts International
$g
65-08B.
790
1 0
$a
Hanna, Awad S.,
$e
advisor
790
$a
0262
791
$a
Ph.D.
792
$a
2004
856
4 0
$u
http://pqdd.sinica.edu.tw/twdaoapp/servlet/advanced?query=3143154
based on 0 review(s)
Location:
ALL
電子資源
Year:
Volume Number:
Items
1 records • Pages 1 •
1
Inventory Number
Location Name
Item Class
Material type
Call number
Usage Class
Loan Status
No. of reservations
Opac note
Attachments
W9195342
電子資源
11.線上閱覽_V
電子書
EB
一般使用(Normal)
On shelf
0
1 records • Pages 1 •
1
Multimedia
Reviews
Add a review
and share your thoughts with other readers
Export
pickup library
Processing
...
Change password
Login