Language:
English
繁體中文
Help
回圖書館首頁
手機版館藏查詢
Login
Back
Switch To:
Labeled
|
MARC Mode
|
ISBD
Optimization approaches for supply n...
~
Ni, Ming.
Linked to FindBook
Google Book
Amazon
博客來
Optimization approaches for supply network coordination and design project scheduling.
Record Type:
Electronic resources : Monograph/item
Title/Author:
Optimization approaches for supply network coordination and design project scheduling./
Author:
Ni, Ming.
Description:
92 p.
Notes:
Source: Dissertation Abstracts International, Volume: 67-06, Section: B, page: 3345.
Contained By:
Dissertation Abstracts International67-06B.
Subject:
Engineering, Electronics and Electrical. -
Online resource:
http://pqdd.sinica.edu.tw/twdaoapp/servlet/advanced?query=3221560
ISBN:
9780542743139
Optimization approaches for supply network coordination and design project scheduling.
Ni, Ming.
Optimization approaches for supply network coordination and design project scheduling.
- 92 p.
Source: Dissertation Abstracts International, Volume: 67-06, Section: B, page: 3345.
Thesis (Ph.D.)--University of Connecticut, 2006.
The manufacturing industries have gradually shifted from "cost-based competition" and "quality-based competition" to today's "time-based competition" with cost and quality considered given. Accordingly, manufacturers are constantly pressed to have short lead times to rapidly respond to changing customer demands. This caused a major shift on manufacturing strategies, including effective coordination with suppliers for raw materials, component, and parts, and speeding up the product design process by using concurrent engineering.
ISBN: 9780542743139Subjects--Topical Terms:
626636
Engineering, Electronics and Electrical.
Optimization approaches for supply network coordination and design project scheduling.
LDR
:03165nmm 2200301 4500
001
1832548
005
20070813115811.5
008
130610s2006 eng d
020
$a
9780542743139
035
$a
(UMI)AAI3221560
035
$a
AAI3221560
040
$a
UMI
$c
UMI
100
1
$a
Ni, Ming.
$3
1921272
245
1 0
$a
Optimization approaches for supply network coordination and design project scheduling.
300
$a
92 p.
500
$a
Source: Dissertation Abstracts International, Volume: 67-06, Section: B, page: 3345.
500
$a
Adviser: Peter B. Luh.
502
$a
Thesis (Ph.D.)--University of Connecticut, 2006.
520
$a
The manufacturing industries have gradually shifted from "cost-based competition" and "quality-based competition" to today's "time-based competition" with cost and quality considered given. Accordingly, manufacturers are constantly pressed to have short lead times to rapidly respond to changing customer demands. This caused a major shift on manufacturing strategies, including effective coordination with suppliers for raw materials, component, and parts, and speeding up the product design process by using concurrent engineering.
520
$a
The first part of the study presents an optimization framework for make-to-order supply network coordination. Interactions among organizations are modeled by a set of inter-organization precedence constraints, and the objective is to achieve the organizations' individual and shared goals of fast product delivery and low inventory. These inter-organization constraints are relaxed by using a set of inter-organization prices that represent marginal costs per unit time for the violation of such constraints. The overall problem is thus decomposed into organizational subproblems, where individual organizations schedule their activities based on their internal situations and inter-organization prices. Coordination is achieved through an iterative price updating process carried out in a distributed and asynchronous manner. With prices dynamically updated and schedules adjusted, this approach coordinates activities to fulfill existing commitments while maintaining agility to take on new orders.
520
$a
In the second part of the study, a novel formulation for design project scheduling with explicit modeling of task dependencies and the associated communication under the concurrent engineering paradigm. General dependencies are modeled as combinations of three basic types representing sequential, concurrent, and independent processes. Communication is modeled as tasks, and its interactions with design tasks are described by sets of inter-task constraints to capture the characteristics of concurrent engineering. A solution methodology that combines Lagrangian relaxation, dynamic programming, and heuristics is then developed to schedule design and communication tasks for timely project completion.
590
$a
School code: 0056.
650
4
$a
Engineering, Electronics and Electrical.
$3
626636
650
4
$a
Operations Research.
$3
626629
690
$a
0544
690
$a
0796
710
2 0
$a
University of Connecticut.
$3
1017435
773
0
$t
Dissertation Abstracts International
$g
67-06B.
790
1 0
$a
Luh, Peter B.,
$e
advisor
790
$a
0056
791
$a
Ph.D.
792
$a
2006
856
4 0
$u
http://pqdd.sinica.edu.tw/twdaoapp/servlet/advanced?query=3221560
based on 0 review(s)
Location:
ALL
電子資源
Year:
Volume Number:
Items
1 records • Pages 1 •
1
Inventory Number
Location Name
Item Class
Material type
Call number
Usage Class
Loan Status
No. of reservations
Opac note
Attachments
W9223412
電子資源
11.線上閱覽_V
電子書
EB
一般使用(Normal)
On shelf
0
1 records • Pages 1 •
1
Multimedia
Reviews
Add a review
and share your thoughts with other readers
Export
pickup library
Processing
...
Change password
Login