Language:
English
繁體中文
Help
回圖書館首頁
手機版館藏查詢
Login
Back
Switch To:
Labeled
|
MARC Mode
|
ISBD
Performance evaluation of unreliable...
~
Xu, Min.
Linked to FindBook
Google Book
Amazon
博客來
Performance evaluation of unreliable production lines using fuzzy linear programming and chance constrained programming.
Record Type:
Electronic resources : Monograph/item
Title/Author:
Performance evaluation of unreliable production lines using fuzzy linear programming and chance constrained programming./
Author:
Xu, Min.
Description:
97 p.
Notes:
Source: Masters Abstracts International, Volume: 44-01, page: 0511.
Contained By:
Masters Abstracts International44-01.
Subject:
Engineering, Industrial. -
Online resource:
http://pqdd.sinica.edu.tw/twdaoapp/servlet/advanced?query=MR04013
ISBN:
0494040130
Performance evaluation of unreliable production lines using fuzzy linear programming and chance constrained programming.
Xu, Min.
Performance evaluation of unreliable production lines using fuzzy linear programming and chance constrained programming.
- 97 p.
Source: Masters Abstracts International, Volume: 44-01, page: 0511.
Thesis (M.A.Sc.)--The University of Regina (Canada), 2005.
Cycle time is an important indicator for capacity evaluation. Not only discrete event simulation models but analytical models can also help elucidate the system behavior. Johri [1987] presented a linear programming model to estimate the capacity of a production line manufacturing multiple products with finite buffers. However, his analytical model didn't explore explicitly the effect of the machine's accidental stoppage and the repairing behavior on cycle time. The objective of my thesis is to expand this analytical model by taking into account the phenomena of random failure and repair of the various machines composing the production line.
ISBN: 0494040130Subjects--Topical Terms:
626639
Engineering, Industrial.
Performance evaluation of unreliable production lines using fuzzy linear programming and chance constrained programming.
LDR
:02622nmm 2200277 4500
001
1819949
005
20061006144042.5
008
130610s2005 eng d
020
$a
0494040130
035
$a
(UnM)AAIMR04013
035
$a
AAIMR04013
040
$a
UnM
$c
UnM
100
1
$a
Xu, Min.
$3
811471
245
1 0
$a
Performance evaluation of unreliable production lines using fuzzy linear programming and chance constrained programming.
300
$a
97 p.
500
$a
Source: Masters Abstracts International, Volume: 44-01, page: 0511.
502
$a
Thesis (M.A.Sc.)--The University of Regina (Canada), 2005.
520
$a
Cycle time is an important indicator for capacity evaluation. Not only discrete event simulation models but analytical models can also help elucidate the system behavior. Johri [1987] presented a linear programming model to estimate the capacity of a production line manufacturing multiple products with finite buffers. However, his analytical model didn't explore explicitly the effect of the machine's accidental stoppage and the repairing behavior on cycle time. The objective of my thesis is to expand this analytical model by taking into account the phenomena of random failure and repair of the various machines composing the production line.
520
$a
A fuzzy linear programming model is first utilized to solve the capacity estimation problem in the manufacturing indicated by imprecise information of cycle time. Meanwhile, since machine failures are described as the problem of a stochastic program, chance constrained programming technique is applied to convert the probabilistic nature of the problem into an equivalent deterministic situation. This approach allows mathematical convenience in the numerical manipulations of down time approximation.
520
$a
The numerical comparisons with discrete-event simulation on a two-machine production line indicate that this analytical model is an alternative solution for capacity estimation when machine performances are unreliable. Then, a numerical example of a five-machine production line case illustrates the application by the analytical approach on the longer production line. Later, through cycle time estimation in a case study, results show that a machine with frequent failures but short repair time is superior to one with infrequent failures but long repair time, if the machine availability is the same.
590
$a
School code: 0148.
650
4
$a
Engineering, Industrial.
$3
626639
650
4
$a
Engineering, System Science.
$3
1018128
690
$a
0546
690
$a
0790
710
2 0
$a
The University of Regina (Canada).
$3
1017617
773
0
$t
Masters Abstracts International
$g
44-01.
790
$a
0148
791
$a
M.A.Sc.
792
$a
2005
856
4 0
$u
http://pqdd.sinica.edu.tw/twdaoapp/servlet/advanced?query=MR04013
based on 0 review(s)
Location:
ALL
電子資源
Year:
Volume Number:
Items
1 records • Pages 1 •
1
Inventory Number
Location Name
Item Class
Material type
Call number
Usage Class
Loan Status
No. of reservations
Opac note
Attachments
W9210812
電子資源
11.線上閱覽_V
電子書
EB
一般使用(Normal)
On shelf
0
1 records • Pages 1 •
1
Multimedia
Reviews
Add a review
and share your thoughts with other readers
Export
pickup library
Processing
...
Change password
Login